Chapter V. PLANS AND PROGRAMMES

Article 28

Waste management plans

 

  1. Member States shall ensure that their competent authorities establish, in accordance with Articles 1, 4, 13 and 16, one or more waste management plans.

Those plans shall, alone or in combination, cover the entire geographical territory of the Member State concerned.

  1. The waste management plans shall set out an analysis of the current waste management situation in the geographical entity concerned, as well as the measures to be taken to improve environmentally sound preparing for re-use, recycling, recovery and disposal of waste and an evaluation of how the plan will support the implementation of the objectives and provisions of this Directive.
  2. The waste management plans shall contain, as appropriate and taking into account the geographical level and coverage of the planning area, at least the following:

(a) the type, quantity and source of waste generated within the territory, the waste likely to be shipped from or to the national territory, and an evaluation of the development of waste streams in the future;

(b) existing waste collection schemes and major disposal and recovery installations, including any special arrangements for waste oils, hazardous waste or waste streams addressed by specific Community legislation;

(c) an assessment of the need for new collection schemes, the closure of existing waste installations, additional waste installation infrastructure in accordance with Article 16, and, if necessary, the investments related thereto;

(d) sufficient information on the location criteria for site identification and on the capacity of future disposal or major recovery installations, if necessary;

(e) general waste management policies, including planned waste management technologies and methods, or policies for waste posing specific management problems.

  1. The waste management plan may contain, taking into account the geographical level and coverage of the planning area, the following:

(a) organisational aspects related to waste management including a description of the allocation of responsibilities between public and private actors carrying out the waste management;

(b) an evaluation of the usefulness and suitability of the use of economic and other instruments in tackling various waste problems, taking into account the need to maintain the smooth functioning of the internal market;

(c) the use of awareness campaigns and information provision directed at the general public or at a specific set of consumers;

(d) historical contaminated waste disposal sites and measures for their rehabilitation.

  1. Waste management plans shall conform to the waste planning requirements laid down in Article 14 of Directive 94/62/EC and the strategy for the implementation of the reduction of biodegradable waste going to landfills, referred to in Article 5 of Directive 1999/31/EC.

 

Article 29

Waste prevention programmes

 

  1. Member States shall establish, in accordance with Articles 1 and 4, waste prevention programmes not later than 12 December 2013.

Such programmes shall be integrated either into the waste management plans provided for in Article 28 or into other environmental policy programmes, as appropriate, or shall function as separate programmes. If any such programme is integrated into the waste management plan or into other programmes, the waste prevention measures shall be clearly identified.

  1. The programmes provided for in paragraph 1 shall set out the waste prevention objectives. Member States shall describe the existing prevention measures and evaluate the usefulness of the examples of measures indicated in Annex IV or other appropriate measures.

The aim of such objectives and measures shall be to break the link between economic growth and the environmental impacts associated with the generation of waste.

  1. Member States shall determine appropriate specific qualitative or quantitative benchmarks for waste prevention measures adopted in order to monitor and assess the progress of the measures and may determine specific qualitative or quantitative targets and indicators, other than those referred to in paragraph 4, for the same purpose.
  2. Indicators for waste prevention measures may be adopted in accordance with the regulatory procedure referred to in Article 39(3).
  3. The Commission shall create a system for sharing information on best practice regarding waste prevention and shall develop guidelines in order to assist the Member States in the preparation of the Programmes.

 

Article 30

Evaluation and review of plans and programmes

 

  1. Member States shall ensure that the waste management plans and waste prevention programmes are evaluated at least every sixth year and revised as appropriate and, where relevant, in accordance with Articles 9 and 11.
  2. The European Environment Agency is invited to include in its annual report a review of progress in the completion and implementation of waste prevention programmes.

 

Article 31

Public participation

 

Member States shall ensure that relevant stakeholders and authorities and the general public have the opportunity to participate in the elaboration of the waste management plans and waste prevention programmes, and have access to them once elaborated, in accordance with Directive 2003/35/EC or, if relevant, Directive 2001/42/EC of the European Parliament and of the Council of 27 June 2001 on the assessment of the effects of certain plans and programmes on the environment <*>. They shall place the plans and programmes on a publicly available website.

———————————

<*> OJ L 197, 21.7.2001, p. 30.

 

Article 32

Cooperation

 

Member States shall cooperate as appropriate with the other Member States concerned and the Commission to draw up the waste management plans and the waste prevention programmes in accordance with Articles 28 and 29.

 

Article 33

Information to be submitted to the Commission

 

  1. Member States shall inform the Commission of the waste management plans and waste prevention programmes referred to in Articles 28 and 29, once adopted, and of any substantial revisions to the plans and programmes.
  2. The format for notifying the information on the adoption and substantial revisions of those plans and programmes shall be adopted in accordance with the regulatory procedure referred to in Article 39(3).

 

Chapter VI. INSPECTIONS AND RECORDS

Article 34

Inspections

 

  1. Establishments or undertakings which carry out waste treatment operations, establishments or undertakings which collect or transport waste on a professional basis, brokers and dealers, and establishments or undertakings which produce hazardous waste shall be subject to appropriate periodic inspections by the competent authorities.
  2. Inspections concerning collection and transport operations shall cover the origin, nature, quantity and destination of the waste collected and transported.
  3. Member States may take account of registrations obtained under the Community Eco-Management and Audit Scheme (EMAS), in particular regarding the frequency and intensity of inspections.

 

Article 35

Record keeping

 

  1. The establishments or undertakings referred to in Article 23(1), the producers of hazardous waste and the establishments and undertakings which collect or transport hazardous waste on a professional basis, or act as dealers and brokers of hazardous waste, shall keep a chronological record of the quantity, nature and origin of the waste, and, where relevant, the destination, frequency of collection, mode of transport and treatment method foreseen in respect of the waste, and shall make that information available, on request, to the competent authorities.
  2. For hazardous waste, the records shall be preserved for at least three years except in the case of establishments and undertakings transporting hazardous waste which must keep such records for at least 12 months.

Documentary evidence that the management operations have been carried out shall be supplied at the request of the competent authorities or of a previous holder.

  1. Member States may require the producers of non-hazardous waste to comply with paragraphs 1 and 2.

 

Article 36

Enforcement and penalties

 

  1. Member States shall take the necessary measures to prohibit the abandonment, dumping or uncontrolled management of waste.
  2. Members States shall lay down provisions on the penalties applicable to infringements of the provisions of this Directive and shall take all measures necessary to ensure that they are implemented. The penalties shall be effective, proportionate and dissuasive.

 

Chapter VII. FINAL PROVISIONS

Article 37

Reporting and reviewing

 

  1. Every three years, Member States shall inform the Commission of the implementation of this Directive by submitting a sectoral report in an electronic form. This report shall also contain information on the management of waste oil and on the progress achieved in the implementation of the waste prevention programmes and, as appropriate, information on measures as foreseen by Article 8 on extended producer responsibility.

The report shall be drawn up on the basis of a questionnaire or outline established by the Commission in accordance with the procedure referred to in Article 6 of Council Directive 91/692/EEC of 23 December 1991 standardising and rationalising reports on the implementation of certain Directives relating to the environment <*>. The report shall be submitted to the Commission within nine months of the end of the three year period covered by it.

———————————

<*> OJ L 377, 31.12.1991, p. 48.

 

  1. The Commission shall send the questionnaire or outline to the Member States six months before the start of the period covered by the sectoral report.
  2. The Commission shall publish a report on the implementation of this Directive within nine months of receiving the sectoral reports from the Member States in accordance with paragraph 1.
  3. In the first report that intervenes by 12 December 2014, the Commission shall review the implementation of this Directive, including the energy efficiency provisions, and will present a proposal for revision if appropriate. The report shall also assess the existing Member State waste prevention programmes, objectives and indicators and shall review the opportunity of Community level programmes, including producer responsibility schemes for specific waste streams, targets, indicators and measures related to recycling, as well as material and energy recovery operations that may contribute to fulfilling the objectives set out in Articles 1 and 4 more effectively.

 

Article 38

Interpretation and adaptation to technical progress

 

  1. The Commission may develop guidelines for the interpretation of the definitions of recovery and disposal.

If necessary, the application of the formula for incineration facilities referred to in Annex II, R1, shall be specified. Local climatic conditions may be taken into account, such as the severity of the cold and the need for heating insofar as they influence the amounts of energy that can technically be used or produced in the form of electricity, heating, cooling or processing steam. Local conditions of the outermost regions as recognised in the fourth subparagraph of Article 299(2) of the Treaty and of the territories mentioned in Article 25 of the 1985 Act of Accession may also be taken into account. This measure, designed to amend non-essential elements of this Directive, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 39(2).

  1. The Annexes may be amended in the light of scientific and technical progress. Those measures, designed to amend non-essential elements of this Directive, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 39(2).

 

Article 39

Committee procedure

 

  1. The Commission shall be assisted by a committee.
  2. Where reference is made to this paragraph, Article 5a(1) to (4) and Article 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof.
  3. Where reference is made to this paragraph, Articles 5 and 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof.

The period laid down in Article 5(6) of Decision 1999/468/EC shall be set at three months.

 

Article 40

Transposition

 

  1. Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with this Directive by 12 December 2010.

When Member States adopt these measures, they shall contain a reference to this Directive or shall be accompanied by such reference on the occasion of their official publication. The methods of making such reference shall be laid down by Member States.

  1. Member States shall communicate to the Commission the text of the main provisions of national law which they adopt in the field covered by this Directive.

 

Article 41

Repeal and transitional provisions

 

Directives 75/439/EEC, 91/689/EEC and 2006/12/EC are hereby repealed with effect from 12 December 2010.

However, from 12 December 2008, the following shall apply:

(a) Article 10(4) of Directive 75/439/EEC shall be replaced by the following:

«4. The reference method of measurement to determine the PCB/PCT content of waste oils shall be fixed by the Commission. That measure, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 18(4) of Directive 2006/12/EC of the European Parliament and of the Council of 5 April 2006 on waste <*>.

———————————

<*> OJ L 114, 27.4.2006, p. 9.»;

 

(b) Directive 91/689/EEC is hereby amended as follows:

(i) Article 1(4) shall be replaced by the following:

«4. For the purpose of this Directive «hazardous waste» means:

— waste classified as hazardous waste featuring on the list established by Commission Decision 2000/532/EC <*> on the basis of Annexes I and II to this Directive. This waste must have one or more of the properties listed in Annex III. The list shall take into account the origin and composition of the waste and, where necessary, limit values of concentration. This list shall be periodically reviewed and, if necessary revised. Those measures, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 18(4) of Directive 2006/12/EC of the European Parliament and of the Council of 5 April 2006 on waste <**>,

———————————

<*> OJ L 226, 6.9.2000, p. 3.

<**> OJ L 114, 27.4.2006, p. 9.»;

 

— any other waste which is considered by a Member State to display any of the properties listed in Annex III. Such cases shall be notified to the Commission and reviewed with a view to adapting the list. Those measures, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 18(4) of Directive 2006/12/EC.

(ii) Article 9 shall be replaced by the following:

«Article 9

The measures necessary for adapting the Annexes of this Directive to scientific and technical progress and for revising the list of wastes referred to in Article 1(4), designed to amend non-essential elements of this Directive, inter alia by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 18(4) of Directive 2006/12/EC.»;

(c) Directive 2006/12/EC is hereby amended as follows:

(i) Article 1(2) shall be replaced by the following:

«2. For the purposes of paragraph 1, point (a), Commission Decision 2000/532/EC <*> featuring the list of waste belonging to the categories listed in Annex I to this Directive shall apply. This list shall be periodically reviewed and, if necessary, revised. Those measures, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 18(4).

———————————

<*> OJ L 226, 6.9.2000, p. 3.»;

 

(ii) Article 17 shall be replaced by the following:

«Article 17

The measures necessary for adapting the Annexes to scientific and technical progress, designed to amend non-essential elements of this Directive, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 18(4).»;

(iii) Article 18(4) shall be replaced by the following:

«4. Where reference is made to this paragraph, Article 5a(1) to (4) and Article 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof.».

References to the repealed Directives shall be construed as references to this Directive and shall be read in accordance with the correlation table set out in Annex V.

 

Article 42

Entry into force

 

This Directive shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.

 

Article 43

Addressees

 

This Directive is addressed to the Member States.

 

Annex I

DISPOSAL OPERATIONS

 

D 1 Deposit into or on to land (e.g. landfill, etc.)

D 2 Land treatment (e.g. biodegradation of liquid or sludgy discards in soils, etc.)

D 3 Deep injection (e.g. injection of pumpable discards into wells, salt domes or naturally occurring repositories, etc.)

D 4 Surface impoundment (e.g. placement of liquid or sludgy discards into pits, ponds or lagoons, etc.)

D 5 Specially engineered landfill (e.g. placement into lined discrete cells which are capped and isolated from one another and the environment, etc.)

D 6 Release into a water body except seas/oceans

D 7 Release to seas/oceans including sea-bed insertion

D 8 Biological treatment not specified elsewhere in this Annex which results in final compounds or mixtures which are discarded by means of any of the operations numbered D 1 to D 12

D 9 Physico-chemical treatment not specified elsewhere in this Annex which results in final compounds or mixtures which are discarded by means of any of the operations numbered D 1 to D 12 (e.g. evaporation, drying, calcination, etc.)

D 10 Incineration on land

D 11 Incineration at sea <*>

———————————

<*> This operation is prohibited by EU legislation and international conventions.

 

D 12 Permanent storage (e.g. emplacement of containers in a mine, etc.)

D 13 Blending or mixing prior to submission to any of the operations numbered D 1 to D 12 <*>

———————————

<*> If there is no other D code appropriate, this can include preliminary operations prior to disposal including pre-processing such as, inter alia, sorting, crushing, compacting, pelletising, drying, shredding, conditioning or separating prior to submission to any of the operations numbered D1 to D12.

 

D 14 Repackaging prior to submission to any of the operations numbered D 1 to D 13

D 15 Storage pending any of the operations numbered D 1 to D 14 (excluding temporary storage, pending collection, on the site where the waste is produced) <*>

———————————

<*> Temporary storage means preliminary storage according to point (10) of Article 3.

 

Annex II

RECOVERY OPERATIONS

 

R 1 Use principally as a fuel or other means to generate energy <*>

———————————

(*) This includes incineration facilities dedicated to the processing of municipal solid waste only where their energy efficiency is equal to or above:

— 0,60 for installations in operation and permitted in accordance with applicable Community legislation before 1 January 2009,

— 0,65 for installations permitted after 31 December 2008, using the following formula:

Energy efficiency = (Ep — (Ef + Ei))/(0,97 x (Ew + Ef))

In which:

Ep means annual energy produced as heat or electricity. It is calculated with energy in the form of electricity being multiplied by 2,6 and heat produced for commercial use multiplied by 1,1 (GJ/year)

Ef means annual energy input to the system from fuels contributing to the production of steam (GJ/year)

Ew means annual energy contained in the treated waste calculated using the net calorific value of the waste (GJ/year)

Ei means annual energy imported excluding Ew and Ef (GJ/year) 0,97 is a factor accounting for energy losses due to bottom ash and radiation.

This formula shall be applied in accordance with the reference document on Best Available Techniques for waste incineration.

The energy efficiency formula value will be multiplied by a climate correction factor (CCF) as shown below:

  1. CCF for installations in operation and permitted in accordance with applicable Union legislation before 1 September 2015.

CCF = 1 if HDD >= 3 350

CCF = 1,25 if HDD <= 2 150

CCF = — (0,25/1 200) x HDD + 1,698 when 2 150 < HDD < 3 350

  1. CCF for installations permitted after 31 August 2015 and for installations under 1 after 31 December 2029:

CCF = 1 if HDD >= 3 350

CCF = 1,12 if HDD <= 2 150

CCF = — (0,12/1 200) x HDD + 1,335 when 2 150 < HDD < 3 350

(The resulting value of CCF will be rounded at three decimal places).

The value of HDD (Heating Degree Days) should be taken as the average of annual HDD values for the incineration facility location, calculated for a period of 20 consecutive years before the year for which CCF is calculated. For the calculation of the value of HDD the following method established by Eurostat should be applied: HDD is equal to (18 °C — Tm) x d if Tm is lower than or equal to 15 °C (heating threshold) and is nil if Tm is greater than 15 °C; where Tm is the mean (Tmin + Tmax)/2 outdoor temperature over a period of d days. Calculations are to be executed on a daily basis (d = 1), added up to a year.

 

R 2 Solvent reclamation/regeneration

R 3 Recycling/reclamation of organic substances which are not used as solvents (including composting and other biological transformation processes) <*>

———————————

<*> This includes gasification and pyrolisis using the components as chemicals.

 

R 4 Recycling/reclamation of metals and metal compounds

R 5 Recycling/reclamation of other inorganic materials <*>

———————————

<*> This includes soil cleaning resulting in recovery of the soil and recycling of inorganic construction materials.

 

R 6 Regeneration of acids or bases

R 7 Recovery of components used for pollution abatement

R 8 Recovery of components from catalysts

R 9 Oil re-refining or other reuses of oil

R 10 Land treatment resulting in benefit to agriculture or ecological improvement

R 11 Use of waste obtained from any of the operations numbered R 1 to R 10

R 12 Exchange of waste for submission to any of the operations numbered R 1 to R 11 <*>

———————————

<*> If there is no other R code appropriate, this can include preliminary operations prior to recovery including pre-processing such as, inter alia, dismantling, sorting, crushing, compacting, pelletising, drying, shredding, conditioning, repackaging, separating, blending or mixing prior to submission to any of the operations numbered R1 to R11.

 

R 13 Storage of waste pending any of the operations numbered R 1 to R 12 (excluding temporary storage, pending collection, on the site where the waste is produced) <*>

———————————

<*> Temporary storage means preliminary storage according to point (10) of Article 3.